AIEnergyTechnology

Tech Giants Bypass Grid Bottlenecks With Natural Gas-Powered AI Data Centers

Major technology companies are increasingly building their own power plants to fuel AI data centers amid lengthy grid connection delays. Oracle and OpenAI’s planned Texas facility will utilize hundreds of natural gas generators to operate independently from the strained electrical grid, according to documents obtained by Business Insider.

AI Infrastructure Race Drives Off-Grid Power Solutions

Technology giants are increasingly building their own power plants to bypass lengthy grid connection delays for AI data centers, with Oracle and OpenAI’s planned Texas facility set to utilize hundreds of natural gas generators, according to reports. The move represents a significant shift in how major tech companies approach energy infrastructure as they race to deploy artificial intelligence capabilities.

EnergyManufacturingTechnology

Ascent Solar Ships Flexible CIGS Panels for Extreme Environment Testing in Ocean and Space Applications

Ascent Solar Technologies has delivered its flexible CIGS thin-film photovoltaic technology to an autonomous underwater vehicle developer and a space power beaming company. The testing aims to validate the technology’s performance in extreme pressure and space environments, potentially enabling persistent ocean monitoring and satellite power transmission.

Thin-Film Solar Technology Enters Extreme Environment Testing

Ascent Solar Technologies Inc has delivered test samples of its lightweight, flexible copper indium gallium diselenide (CIGS) thin-film photovoltaic modules to two companies operating in extreme environments, according to company reports. The Thornton, Colorado-based manufacturer reportedly shipped its specialized solar technology to an ocean monitoring technology firm and a space power lasing company for rigorous testing in challenging operational conditions.

EnergyInnovationTechnology

UK’s Largest Solar Farm Proposal Faces Planning Inspectorate Scrutiny Amid Local Opposition

Campaigners describe the proposed 1,200-hectare Green Hill Solar Farm as “absolutely crippling for our villages” as the Planning Inspectorate hearing begins. Developers argue the project would deliver significant benefits and power homes by 2029 if approved.

Planning Battle Over UK’s Largest Solar Farm

The future of what would become the United Kingdom’s largest solar farm is now before the Planning Inspectorate, with hearings beginning amid strong local opposition. According to reports, the proposed Green Hill Solar Farm would span approximately 1,200 hectares between Wellingborough and Northampton, generating significant debate about renewable energy infrastructure versus countryside preservation.